Saltar al contenido

Renewable Energy: licitaciones — Guinea

2 avisos abiertos en este momento. Las licitaciones se recopilan varias veces al día de las publicaciones oficiales (portales nacionales, Banco Mundial, Unión Europea, PNUD). Cada aviso indica el comprador y la fecha límite, y enlaza a la publicación oficial.

Recibir los avisos de mi sector

2 avisos abiertos

Búsqueda avanzada
  • Obras🇬🇳 Guinea

    Design and Construction Works for Water Treatment Plant at Yessoulou IV

    The Société des Eaux de Guinée (SEG SA), funded by the World Bank, invites prequalification applications for the design and construction of a potable water treatment plant at Yessoulou IV, including a photovoltaic panel field and access road. The buyer is the Guinea Water and Sanitation Project (PEAG) based in Conakry, Guinea. The submission deadline is January 12, 2027, at 10:30 GMT. The procedure follows the World Bank Procurement Regulations (7th edition) and is open to all eligible applicants. The prequalification documents are available in French for a fee of 1,800,000 GNF and will be sent by email upon proof of payment.

    Guinea Water and Sanitation Project
    Financiado por World Bank
    Fecha límite : 12 ene 2027
    Construction MaterialsRenewable Energy
  • Servicios🇬🇳 Guinea

    Planning services for roof renovation and PV installation in Conakry

    The Bundesamt für Auswärtige Angelegenheiten is procuring general planning services for roof renovation at the chancery and residence in Conakry, including implementation of a photovoltaic system. The work involves preparing planning documents and functional descriptions as the basis for the project realization planned for 2026-2027. The construction method must be suitable and durable for local conditions. The procurement procedure and deadline are not stated. The buyer is located in Guinea.

    Bundesamt für Auswärtige Angelegenheiten
    Financiado por European Union
    Sin fecha límite indicada
    Construction MaterialsRenewable Energy