EPC Contract for 400kV Transmission Line Songo-Matambo, Mozambique
- Ülke
- 🇲🇿 Mozambique
- Son tarih
- 30 Kasım 2026 Pazartesi 14:00
- Alıcı
- Electricity of Mozambique
- Kaynak
- Dünya Bankası · World Bank
- Proje
- Green Energy Corridors Project
- tarihinde yayınlandı
- 13 Eki 2026
Özet
Electricidade de Moçambique (EDM) invites sealed bids from eligible bidders for the design, supply, installation, testing, commissioning and handover of a 121 km 400 kV overhead transmission line between Songo and Matambo Substations in Mozambique. This contract is part of the Green Energy Corridor Project financed by the World Bank. The contract duration is 30 months with a two-envelope bidding process without prequalification. The bidding is internationally competitive and open to all eligible bidders as defined by the World Bank regulations. Bidding documents in English are available free of charge upon request. Submission deadline is 30 November 2026 at 14:00 local time. No electronic bidding accepted.
Tam ilanları okumak için tedarikçi hesabınızı oluşturun
Verified ve Pro tedarikçiler tam metni, belgeleri, alıcı iletişimini görür ve günlük uyarı alır.
Shipsen Market kamu ilanlarını kaynaklarının yayınladığı şekliyle aktarır. Teklif vermeden önce koşulları her zaman resmi sitede kontrol edin.