Hydro-Electro Mechanical Works for Mt. Coffee Hydropower Plant Extension
- Ülke
- Western and Central Africa · Bölgesel
- Son tarih
- 14 Aralık 2026 Pazartesi 10:00
- Alıcı
- Liberia Electricity Corporation
- Kaynak
- Dünya Bankası · World Bank
- Proje
- Regional Emergency Solar Power Intervention Project
- tarihinde yayınlandı
- 4 Eki 2026
Özet
The Liberia Electricity Corporation (LEC) invites international bids for the design, supply, installation, testing, and commissioning of hydro-electromechanical works for the Mt. Coffee Hydropower Plant Extension, located about 30 km from Monrovia. This contract involves adding 4x10.5 MW Kaplan turbines and associated equipment to increase capacity by 42 MW. The contract duration is 36 months. Bidding documents cost USD 200 and can be obtained by written application. Bids must be submitted by 10:00 AM GMT on December 14, 2026. The procurement is under World Bank regulations with an international competitive bidding process.
Tam ilanları okumak için tedarikçi hesabınızı oluşturun
Verified ve Pro tedarikçiler tam metni, belgeleri, alıcı iletişimini görür ve günlük uyarı alır.
Shipsen Market kamu ilanlarını kaynaklarının yayınladığı şekliyle aktarır. Teklif vermeden önce koşulları her zaman resmi sitede kontrol edin.