Upgrading Link Roads to Bitumen and Footbridge Construction in Meru Town
- Ülke
- 🇰🇪 Kenya
- Son tarih
- 26 Kasım 2026 Perşembe 11:00
- Alıcı
- Kenya National Highways Authority
- Kaynak
- Dünya Bankası · World Bank
- Proje
- Horn of Africa Gateway Development Project
- tarihinde yayınlandı
- 13 Eki 2026
Özet
Kenya National Highways Authority (KeNHA) invites sealed bids for upgrading selected link roads to bitumen standards and construction of 2 footbridges within Meru Town, Kenya, under the Horn of Africa Gateway Development Project funded by the World Bank. The contract includes upgrading several roads totaling approximately 18.8 km and building footbridges at two locations. The works period is 40 months including defects liability. Bidding is international competitive using a two-envelope system with sealed bids submitted by 26 November 2026 at 11:00 local time. Tender documents are available free of charge online at KeNHA and the Public Procurement Information Portal.
Tam ilanları okumak için tedarikçi hesabınızı oluşturun
Verified ve Pro tedarikçiler tam metni, belgeleri, alıcı iletişimini görür ve günlük uyarı alır.
Shipsen Market kamu ilanlarını kaynaklarının yayınladığı şekliyle aktarır. Teklif vermeden önce koşulları her zaman resmi sitede kontrol edin.