
Industrial Lifting Gantry 30 t - 100 t
Motorized lifting gantry for heavy handling on construction sites and industrial facilities, with visible capacity up to 30 tonnes.
Updated 16 Nov 2026
- Minimum order
- 1 units
- Lead time
- 30 à 90 jours selon configuration
- Supply ability
- Sur demande
Product overview
Overview
Industrial lifting gantry designed for heavy handling operations on construction sites, prefabrication areas, or industrial sites. The photo shows a large-sized rolling gantry with a painted steel structure, with a visible capacity up to 30 t. This type of equipment is suitable for moving and positioning heavy elements such as concrete parts, frameworks, technical equipment, or production loads.
Specifications
- Mechanically welded steel gantry structure
- Capacity visible in the photo: max. 30 t
- Motorized version for lifting and translation
- Suitable for outdoor use on dedicated work areas
- Configuration, span, and effective height to be defined according to the project
- Controls, power supply, and options available upon request
Packaging & shipping
Export delivery in subassemblies to facilitate transport and on-site assembly. Standard packaging with protection for electrical components and painted surfaces. Shipment possible by truck, flatbed trailer, or maritime solution adapted to the project dimensions.
Customisation & MOQ
MOQ: 1 unit. Manufacturing/configuration according to customer needs: capacity, span, height, speed, power supply, and installation environment. Indicative lead time: 30 to 90 days depending on technical study and workshop workload.
Why source this from INDURA
INDURA, based in Casablanca, supports B2B buyers on handling and construction equipment projects. The company can offer an export package including needs assessment, customized configuration, and logistical coordination for African markets.
Questions about Industrial Lifting Gantry 30 t - 100 t
- What is the minimum order quantity?
- The minimum order quantity is 1 unit.
- What are the manufacturing and delivery lead times?
- The indicative lead time is 30 to 90 days depending on configuration, technical study, and production scheduling.
- Can the lifting gantry be customized?
- Yes. Capacity, span, effective height, power supply, and other parameters can be configured according to the project requirements.
- Do you offer samples or validation before order?
- For this type of heavy equipment, samples are generally not applicable. Detailed photos, technical elements, and validation exchanges can be provided upon request before launch.
Specifications
| Voltage | À préciser selon configuration |
|---|---|
| Capacity | Jusqu’à 30 t |
| Type de produit | Portique de levage industriel |
| Capacité nominale | Jusqu’à 30 t (selon indication visible sur la photo) |
| Structure | Acier mécano-soudé |
| Couleur | Jaune industriel |
| Mode de fonctionnement | Levage et translation motorisés |
| Installation | Montage sur site |
| Environnement d’utilisation | Chantier, préfabrication, zone industrielle |
| Portée | Sur demande selon projet |
| Hauteur utile | Sur demande selon projet |
| Alimentation électrique | À préciser selon configuration |
| Finition | Peinture industrielle |
| Condition de livraison | En sous-ensembles pour transport export |
Customization
- OEM
- ODM
Configuration possible selon capacité, portée, hauteur, alimentation et conditions d’installation.
Packaging & shipping
- Packaging
- Livraison en sous-ensembles, protection des composants électriques et des surfaces peintes, expédition par remorque plateau ou solution maritime adaptée.





